HOW TO APPLY PRODUCT

BOB’S BEST APPLICATION PROCESS

Here’s how to apply our End Dust™ Magnesium Chloride Flake product to unpaved roadways and other dirt or gravel surfaces. The same method can be applied on a smaller scale to both indoor and outdoor riding arenas:

  1. STEP 1: PREPARE SURFACE

    – The first step is to prepare the road surface.
    – Work the road with a grader into a smooth and consistent surface.
    – If washboards or potholes are present, cut enough to eliminate them.
    – After blading the road, you will have a windrow that can be placed in the middle of the road or down one side.

    applying dust control product grader

  2. STEP 2: ADD WATER

    – Bring in the water truck and spray the road and windrow.
    – Apply as much water as you can. The moisture will create a strong binder.
    – After the road is soaked down, move your windrow across the road to reshape it.
    – Try not to overwork the material.
    – Add more water, soak down to the point of almost puddles.

    water truck for dust control

  3. STEP 3: APPLY PRODUCT

    – Apply product with any type of spreader used for sand, salt, or seed.
    – The road should look like it was just fertilized.
    – When the product hits the ground you will hear a popping sound, which means the water content is perfect.
    IMPORTANT – Do NOT add water after applying product!
    – Keep traffic off the road for as long as possible, up to 12 hours.

    how to apply mag chloride dust control

  4. APPLICATION TIPS

    – Moisture is the key to the successful application of this product.
    – Each application prep will vary depending on composition of the road surface, the volume of traffic on the roadway, and the soil conditions.
    – For example, a clay base road will not need as much water as a sand base road.

  5. COVERAGE

    – Minimum two (2) bags will cover 1 KM – 4 to 6 meters wide – (CANADA)
    – Minimum one-and-a-half (1.5) bags will cover 1 MILE – 15’ to 17’ wide – (USA)

order product